Friday, February 17, 2012

2nd phase of the Khufu solar boat restoration project

Ahram Online (Nevine El-Aref)

With three photos.

At an international press conference held on Egypt's Giza Plateau next Monday, Egyptian Minister of State for Antiquities Mohamed Ibrahim is expected to announce the launch of the second phase of the Khufu solar boat restoration project, which is being carried out in collaboration with a Japanese archaeological team from Wasida University.

Ibrahim told Ahram Online that the team would collect samples of the boat’s wooden beams for analysis on Monday in order to draw up accurate plans for the boat's restoration in a special museum located on the plateau.

The first phase of the project, carried out two years ago, assessed the area surrounding the second boat pit with the use of topographical radar surveys. A large hangar has since been built over the second pit, with a smaller hangar erected inside to cover the top of the boat itself. The hangars were especially designed to protect the wooden remains during the project's analysis and treatment phases.


No comments: